English

 Light Steel Structure Pig House

Light Steel Structure Pig House

Time: 2018-12-21

Views : 1869

Product Informaition

Materials:

1. The main frame of light steel structure warehouse(columns and beams) is made of welded H-style steel.

2. The columns are connected with the foundation by pre-embedding anchor bolt.

3. The beams and columns, beams and beams are connected with high intensity bolts.

4. The envelop construction net is made of cold form C-style purlins.

5. The wall and roof are made of color steel board or color steel sandwich panels, which are connected with the purlin by Self-tapping nails.

6. Doors and windows can be designed at anywhere which can be made into normal type, sliding type or roll up type with material of PVC, metal, alloy aluminum, sandwich panel and so on.

Item name

Material characteristics

Material Grade

Surface Treatment

Anchor bolt

Steel rod M24,M27,M30,M33,M39,M42

Q235B


Steel Column

H shape, Box, steel pipe, Hot rolled sheet

Q235B,Q345B

Paint or Hot dip galvanized

Steel Bracing

Steel rod, Steel pipe, Angle steel

Q235B,Q345B

Paint or Hot dip galvanized

Steel Beam

H shape, steel Truss, Hot rolled sheet

Q235B,Q345B

Paint or Hot dip galvanized

Steel Purlin

C or Z shape, steel purlin Thickness:1.8mm~3.0mm

Q235B,Q346B

Hot dip galvanized

External wall panel, Roof panel

Single colorful corrugate steel sheet, Sanwich panel with EPS, Rock wool, Pu, Glass wool etc.,

Steel T=0.426~0.8mm, insulation T=50~150mm

Alu-zinc 150g, 
Fluorocarbon paint

Door

Sliding or rolling door

Steel or Aluminum sheet,T=1.0~1.5mm 

Paint or Hot dip galvanized

Window

Aluminium alloy-Glass, Alminium alloy-shutter

T=1.0~2.0mm

Alloy

Daylighting panel

FRP, T=1.5mm or T=1.8mm

Coefficient of thermal expansion:2.2x10-5/cm/

cm/ºC

Light transmittance 85%

Ventilator

Turbine ventilator, ventilator along a slope, ventilator on a ridge

Steel,stainless steel, PC

Paint or Hot dip galvanized,304

Gutter

Galvanized Steel plate, stainless steel plate

T=2.0mm

Hot dip galvanized,304

Downpipe

PVC pipe

Φ110,160,200

Paint

Bolt

Ordinary, high strength, galvanized

10.9S,4.8s

Hot dip galvanized

 

Steel structure office building fabrication process:

1. Prepare raw materials : cut steel plate or use internation size H section steel and angle steel, round tube, round steel, square tube etc.;

2. Assembly and welding: our welders will follow the drawings to assemble the steel members and weld them together as a entire beam/column/brace and so on; (Our quality inspector will check the steel pieces after finish welding, this is the first quality check)

3. Sand blast : After finish welding and polishing, our sand blast effect can reach internation 2.5 high grade, very good for resist rust; (Secondary quality check)

4.Paint : Within 2 hours after sand blast, all the steel members should be paint. Client can choose any color and any brand of paint. (The third quality check)

5. Inspect the goods by client : After we finish a part of fabrication work, we will invite clients to check the goods before we pack the steel frame.

6.Packing and loading : If clients require us to load the goods by close containers, we will pack the steel structure members one by one on the steel skid and tie the whole steel package well. (The fourth quality check )<!--[if !supportLineBreakNewLine]--><!--[endif]-->


Advantage of the building:

(1) Enough strong
it can  resist 70m/s hurricane and G10 seismic intensity and protect your life and property. Furthermore, we also can design and build a stronger building according to your required.
(2) No water-seepage problem.
through the research and test by our technical team and construction team, we designed a whole reasonable and effective method of flashing plate and over-lapped of steel sheet, include(1. flashing plate on the roof, wall, bridge, eave, gutter and frame of window and door, 2. Joints between steel sheets and sky lighting belts, 3. Waterproof of nails ), with accuracy process and superior quality closure strips, we successfully reduce the leakage place from 1/1000 to 1/2500 place/sqm.
(3) High-performance heat insulation
Many sorts of material can be use as the roof panel and wall panel, which can bring the warm in winter and cold in summer for you house.
(4) Excellent Anti-corrosion and long life
shot blasting and 4 layers paint(90micron)/1 layer hot deep galvanized (80-200g/sqm) will provide our building 25-50 years life.
(5) Good air permeability and more natural lighting
natural roof turbine ventilators, bridge ventilators, Roof sky lighting belts, Wool sky lighting belts and varies of windows, they will bring us more  fresh air and natural lighting.
(6) Quick installation
12 workers can assemble 1000sqm within 20 days.
(7) 100% recovery.


 

We can also provide you below service:
1. Livestock house site selection;
2. Livestock house design and construction;
3. Livestock equipment installation;
4. Livestock house worker training;
5. Rearing technology guidance;
6. After-sale service;



Inquiry Now

If you have any questions, feedback or comments, please fill out the form below and we will reply you back as soon as possible.

+